• Home
  • About Us
  • Contact Us
Tuesday, May 20, 2025
  • Login
No Result
View All Result
Rwanda Dispatch News Agency
Magazine
  • Home
  • Business
  • Politics
  • National
  • Economy
  • Social
  • Opinions
  • Sport
  • E-dition
  • Entertainment
  • Home
  • Business
  • Politics
  • National
  • Economy
  • Social
  • Opinions
  • Sport
  • E-dition
  • Entertainment
No Result
View All Result
Rwanda Dispatch News Agency
No Result
View All Result
Home Economy

Rwanda inks deal to build nuclear power reactor

by Admin
13 September 2023
in Economy
0
Rwanda inks deal to build nuclear power reactor
Share on FacebookShare on TwitterWhatsapp
PDF Button
Rwanda will build a test nuclear reactor using novel technology under an agreement between the East African country and a Canadian-German company called Dual Fluid Energy Inc.
The deal was signed on Tuesday, September 12, in a new partnership between Dual Fluid Energy, a Canadian-German nuclear technology firm and the Rwandan government.

The reactor will use an innovative technique developed by the startup company using liquid fuel and lead coolant, resulting in less radioactive waste, the Rwanda Atomic Energy Board said in a statement.
The demonstration reactor is expected to be operational by 2026 and the subsequent testing of the Dual Fluid technology is to be completed by 2028.
The test phase will cost 70 million euros ($75 million), to be financed by the company, Dual Fluid CEO Goetz Ruprecht told a news conference in Kigali.

Rwanda generates electricity with a capacity of 33.2 megawatts (MW) from hydropower dams, and the rest from methane, solar and peat.
At present Rwanda has an installed electricity generation capacity of 332.6 megawatts(MW), most of which is from hydropower dams and the rest from methane, solar and peat.
Rwanda Atomic Energy Board (RAEB) Chief Executive Fidel Ndahayo said that they had agreed with Dual Fluid on a road map for the implementation of the test reactor after the tests are complete.
“Once success criteria are achieved, both parties will proceed with next technological readiness levels including testing of the nuclear power plant design, construction and operations based on the experiment results.” Ndahayo added.

Related Posts:

  • Africa exploring nuclear plan for power needs
    Africa exploring nuclear plan for power needs
  • HM King Mohammed VI Addresses Speech to 1st China-Arab Summit Held in Saudi Arabia
    HM King Mohammed VI Addresses Speech to 1st China-Arab…
  • Water-saving irrigation boosts land productivity in Rwanda
    Water-saving irrigation boosts land productivity in Rwanda
  • Unseen Struggles: Hope and Healing in Rwanda's Fight Against Elephantiasis
    Unseen Struggles: Hope and Healing in Rwanda's Fight Against…
  • President Kagame holds the Annual Diplomats’ Luncheon
    President Kagame holds the Annual Diplomats’ Luncheon
  • <strong>Innovative Game Transforms Youth Sexual Reproductive Health Education in Rwanda</strong>
    Innovative Game Transforms Youth Sexual Reproductive Health…
Tags: dealnuclearpower reactor
Admin

Admin

Next Post
New Minister of Infrastructure takes office

New Minister of Infrastructure takes office

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Search

No Result
View All Result

Mount Meru Gas

e-Dispatch

e-Dispatch

Click here to download this magazine

Organic Beer

archives

May 2025
M T W T F S S
 1234
567891011
12131415161718
19202122232425
262728293031  
« Apr    

Dispatch Agency Ltd is a local media institution based in Kigali with various media related products premiered with The Dispatch News Magazine.

  • Home
  • About Us
  • Contact Us

© 2023 Rwanda Dispatch .

No Result
View All Result
  • Home
  • Business
  • Politics
  • National
  • Economy
  • Social
  • Opinions
  • Sport
  • E-dition
  • Entertainment

© 2023 Rwanda Dispatch .

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In